Leichhardt Gas Fired Power Station Mechanical Works
Location: Mt Isa- QLD
Duration: 6 Months
Value: $1.1m

DESCRIPTION:
Leichhardt Power Station delivers 60 MW of Open Cycle Gas Turbine power generation. Pructon undertook fabrication and installation of piping on the mineral lube lines, cooling water, fuel gas and fuel oil. We undertook on site surface treatment and provided assistance with commissioning and testing.
High pressure gas piping was fabricated and installed with over 600 butt welds completed with no recorded failures.Welds were 20% and 100% NDT for all high pressure gas pipe.Piping consisted of Stainless steel, carbon to stainless steel, super duplex and carbon steel.
![]() | ![]() | ![]() | ![]() |
---|---|---|---|
![]() | ![]() |