Pructon was engaged by the Burke Shire Council to design and construct two 225 kL tanks. 

Pructon was required to pour concrete foundations, install piping and fabricate structural steel platforms.  Pructon was responsible for the fabrication and installation of a platform for accessing the clarifier.  All works were project managed by Pructon.

DESCRIPTION:

Location: Gregory Plains-QLD

Duration: Current and ongoing
Value: $425,000