Export Wharf Structural Modifications & Surface Treatment

Project Details

Works were undertaken on the export wharves at the Rio Tinto Gove refinery for structural and painting remediation.

The existing pylons and underfloor structure were strengthened to bring the wharf back in line with the code.

Steelwork was then sandblasted and coated with Interzone 954.

Works were undertaken within shipping movements. Scheduling was key to the project delivery.

Scope of Work

  • Off-site fabrication and surface treatment of structural steel
  • Installation of structural steel and site welding
  • On-site sandblasting and painting
  • Underslung scaffolding
  • Cathodic protection

Client:

Rio Tinto

Location:

Gove Peninsula (Arnhem Land), NT

Year of Completion:

2018